Scenario lab
Amend any lever and watch the forward model, the binding constraint and the target gap move. The baseline is never mutated — scenarios are a layer on top of it.
How to use this page
- Pick the stage you want to test below — the tabs follow the process from feedstock through to the grid.
- Move a lever. The four figures at the top update immediately and show the change against the approved baseline.
- Open the question mark on a lever to see what it does and what risk it introduces before you rely on the result.
- Save it with a reason. Nothing you do here changes the approved baseline until someone with approval rights promotes it.
Grid injection
7,735.7Nm3/day
Binding constraint
Reception / TMA
Target achievement
37.8%
Revenue opportunity
2,395.9GBP k/yr
baseline 209.534 t/day
untracked
t/day
baseline 112.329 t/day
untracked
t/day
baseline 0.16 fraction
untracked
fraction
baseline 0.85 fraction
untracked
fraction
baseline 292 kg/t
untracked
kg/t
baseline 5.5 pH
untracked
pH
baseline 365 days
days
Scenario versus baseline
Side-by-side on the numbers that decide whether a change is worth making.
| Metric | Baseline | Scenario | Change |
|---|---|---|---|
| Feed throughput (t/day) | 117.86 | 117.86 | +0 |
| Biogas (Nm3/day) | 12,484.85 | 12,484.85 | +0 |
| Biomethane (Nm3/day) | 7,374.61 | 7,374.61 | +0 |
| Grid injection (Nm3/day) | 7,735.69 | 7,735.69 | +0 |
| HRT (days) | 67.88 | 67.88 | +0 |
| OLR VS (kg/m3/d) | 2 | 2 | +0 |
| Target achievement (%) | 37.79 | 37.79 | +0 |
Save and govern
Scenarios are saved as drafts with a reason and an audit entry. Approval is a separate, role-gated step.
Save this scenario
Sign in to save scenarios, record a reason and generate an audit entry.
