Bottleneck analysis

Forward capability against the backward requirement for Yorkshire — REL. The constraint list is ranked by capacity, not by opinion.

Forward achievable

7,735.7Nm3/day

Backward required

20,472Nm3/day

Production gap

-12,736.3Nm3/day

Extra feedstock needed

196.3t/day

Binding constraint

The single stage setting plant throughput today.

Reception / TMA
Binding

Root cause

Reception/TMA processing rate or operating window limits intake.

Intervention

Extend the operating window, add a shift, or uprate the TMA line carrying the larger share.

+2,414.7 Nm3/day released before the next constraint binds (Digestion)

Risk introduced

Longer operating windows may breach permit delivery restrictions.

Shortfall against requirement: 196.3 t/day · lost gas 12,883.2 Nm3/day

Constraint ladder

Removing one constraint promotes the next. This is the order in which capacity will unlock.

RankStageCapacity t/dayRequired t/dayShortfallLost gas Nm3/dayIntervention
1Reception / TMAbinding117.9314.1196.312,883.2Extend the operating window, add a shift, or uprate the TMA line carrying the larger share.
2Digestion154.6314.1159.510,468.4Add digester volume, dilute the feed, or rebalance allocation across digesters.
3Soup production & storage235.7314.178.45,147.5Uprate the soup production line or extend soup-making hours.
4Biogas upgrading (BUU)289.1314.1251,643.6Uprate or add BUU capacity, or reduce CHP/boiler gas draw.
5Grid entry (NEA)310.2314.13.9259Negotiate a higher NEA limit, add storage, or divert surplus to CHP.
6Feedstock supply313.2314.1163Secure additional feedstock or reduce the contamination/rejection fraction at reception.
7Hydrolysis329.4314.100Raise hydrolysis temperature, uprate the feed pump, or add working volume.
8Transport466.7314.100Add a tanker, increase payload, cut shunting/travel time, or approve parallel load/unload.
9Pasteurisation608.6314.100Add a tank, shorten non-hold cycle elements, or improve heat recovery to cut heat-up time.

Backward chain

Working back from the grid target to the feedstock tonnage the plant would need at the gate.

StepRequirementBasis
Grid injection target20,472 Nm3/dayAnnual target divided by operating days
Propane enrichment955.6 Nm3/dayGCV energy balance to the network entry specification
Biomethane19,516.4 Nm3/dayTarget less the propane contribution
Biogas to BUU33,040.3 Nm3/dayDivided by CH4 content and BUU methane recovery, plus CHP draw
Digester push305.7 m3/dayYield basis in reverse, sharing the forward chemistry
Pasteurised volume305.7 m3/dayEqual to digester push, no interstage loss modelled
Soup required305.7 t/dayConverted at the blend density
Feedstock at the gate314.1 t/dayGrossed up for the contamination rejection rate
Tanker loads11.3 /dayAt the configured payload